RP 7G-ENGL L m Ob09bb2 m. Recommended Practice for Drill Stem Design and Operating Limits. API RECOMMENDED. 1 Aug API RP 7G (R). Recommended Practice for Drill Stem Design and Operation Limits, Sixteenth Edition, Includes Addendum 1 and 2 (). 1 Aug API RP 7G-2 (R). Recommended Practice for Inspection and Classification of Used Drill Stem Elements, First Edition (Identical Adoption of.

Author: Tausida Shakarg
Country: Guyana
Language: English (Spanish)
Genre: Life
Published (Last): 11 January 2016
Pages: 484
PDF File Size: 19.93 Mb
ePub File Size: 16.95 Mb
ISBN: 183-5-83885-363-9
Downloads: 55218
Price: Free* [*Free Regsitration Required]
Uploader: Gular

Not Logged In Member?: How to choose the right drill pipe.

Tubecare » API-RP 7G – 2, STANDARD DS-1 AND NS-2 INSPECTION

As I’ve stated, thorough inspection is vital. Lower classes can be used, but as the class goes ep7g, so does the api rp7g of jobs they can be used on. Given that api rp7g initial inspection was correctly done, the factors that should determine when re-inspection is needed are accumulated fatigue and accumulated wear:.

He is Rental Supervisor for Odfjell Romania. They were placed gp7g your computer when you launched this website. Subscribe to our Blog. November Petroleum and natural gas api rp7g – Rotary drilling equipment – Part 2: Such estimates are little better than wild guesses because they don’t take into account how the components in question are loaded. Neither do they consider api rp7g probable failure modes.

API Connections

When inspection has api rp7g the pipes are categorized into classes. It really depends on the conditions you’re drilling in. The inspector will look at high-stress areas, including threads, slip areas, weld areas and radius changes, to detect if any fatigue or cracks have occurred in the pipe. The forth edition of DS1 states: Inspection methods for drill pipe according api rp7g the Standard DS1 Vol3.

Full Description API RP 7G-2 specifies the requirements for each level ali inspection and procedures for the inspection and testing of used drill stem elements. Visit FileOpen to see the api rp7g list. For example if category 4 is requested, api rp7g the methods highlighted in yellow need to be performed on the pipe.

The pipes need to be able to take the load capacity, the thread dimensions must be correct and fatigue needs to be eliminated.

A blog from Odfjell Well Services

There is no definitive answer to this question. January Petroleum and natural gas industries. Understanding the inspection process for drilling tubulars Posted by Alexandru Pusca What you can do with a Secure PDF: Globally, some inspection standards apply depending on customer requirements in api rp7g drilling areas.

R7pg the other hand, deep well drilling could result in more stress to the pipe and inspection periods will need to be shorter. There is some inspection that can be done in the field, eg. Something none of us want! Reliability api rp7g inspection process depends on standards. You can change your cookie settings through your browser.

This method ensures top quality equipment is ready and provided to the next customer. Accumulated fatigue damage on drill pipe tubes should determine when to api rp7g a re-inspection Load capacity: Posted by Alexandru Pusca What do we look for when inspecting?

Inspection and classification of used drill stem elements. Load api rp7g will be affected api rp7g wear on a;i joints and tube bodies. What happens after inspection? Search the Blog Search. DRM is included at the request of the publisher, as it helps them protect their copyright by restricting file sharing.

Many methods are used during api rp7g inspection process, api rp7g This document also specifies the qualification of inspection personnel, api rp7g description of inspection methods and apparatus calibration and standardization procedures for various inspection methods. Alexandru has been in the business for over 15 years and has been at Odfjell since Our policy towards the use of cookies Techstreet, a Clarivate Analytics brand, uses cookies to improve your online experience.

This document has been prepared to address the practices and technology commonly used in inspection. Standards Reliability of inspection process depends on api rp7g. The evaluation of imperfections and the marking of inspected drill stem elements is included.